This project was a 5-story mixed-use building with standpipes and fire pump and seismic calculations. This was a modular building built off site in units with all the MEP work pre-installed and units assembled onsite. Additional consideration was needed to ensure prefabricated units could attach easily and correctly upon building assembly.
Description
This project was a 5-story mixed-use building with standpipes and fire pump and seismic calculations. This was a modular building built off site in units with all the MEP work pre-installed and units assembled onsite. Additional consideration was needed to ensure prefabricated units could attach easily and correctly upon building assembly.
New Construction
25,000 to 50,000
5
250 to 500, 1,250 to 1,500
5
NFPA 13, 14, and 20
Fire Pump, Stand Pipe, Wet
Residential, Light
Municipal +Fire Pump