BRYK on Broadway was zoned per floor with a combined standpipe system. A remote dry system supplied coverage to the attic.
New Construction
225,000 to 250,000
7
2,250 to 2,500
NFPA 13 and 14
Dry, Stand Pipe, Wet
Residential, Light, Ordinary
Municipal Supply
Description
BRYK on Broadway was zoned per floor with a combined standpipe system. A remote dry system supplied coverage to the attic.
New Construction
225,000 to 250,000
7
2,250 to 2,500
7
NFPA 13 and 14
Dry, Stand Pipe, Wet
Residential, Light, Ordinary
Municipal Supply