One unique thing about this project was the pipe routing. The system main was ran on the 2nd floor and all units on 1st floor were fed from a branch line that ran down through a chase in every unit.
New Construction
0 to 25,000
2
0 to 250
1
NFPA 13
Wet
Light, Ordinary
Municipal Supply
Description
One unique thing about this project was the pipe routing. The system main was ran on the 2nd floor and all units on 1st floor were fed from a branch line that ran down through a chase in every unit.
New Construction
0 to 25,000
2
0 to 250
1
NFPA 13
Wet
Light, Ordinary
Municipal Supply