Driven Fire Consultants prepared the engineered fire protection plans and specifications for the architect designing this powder coating facility. The project consisted of a new powder coating, assembly, and storage facility as well as an existing machine shop. There was a limited municipal water supply at this location and the owner wanted to avoid a fire water storage tank. By working with the owner and architect, storage heights were limited to maximize the available municipal water supply with the use of a fire pump. Determining the system requirements helped fire protection contractors prepare accurate bids with limited questions.
Description
Driven Fire Consultants prepared the engineered fire protection plans and specifications for the architect designing this powder coating facility. The project consisted of a new powder coating, assembly, and storage facility as well as an existing machine shop. There was a limited municipal water supply at this location and the owner wanted to avoid a fire water storage tank. By working with the owner and architect, storage heights were limited to maximize the available municipal water supply with the use of a fire pump. Determining the system requirements helped fire protection contractors prepare accurate bids with limited questions.
New Construction, Remodeled Facility
25,000 to 50,000
1
0 to 250
1
NFPA 13 and 20
Wet
Continuous Spray Application/Automatic Powder Application (NFPA 33), Light, Ordinary, Special, Storage
Municipal +Fire Pump