This is a 3 zone, 3 story project that was designed to FM Global standards requiring extra attention to ensure the system meets these standards. This included determining proper protection that both meet the standards requirements and minimized additional pipe sizing and components in several storage rooms throughout that required particular attention.
Description
This is a 3 zone, 3 story project that was designed to FM Global standards requiring extra attention to ensure the system meets these standards. This included determining proper protection that both meet the standards requirements and minimized additional pipe sizing and components in several storage rooms throughout that required particular attention.
Shell Fit-out
50,000 to 75,000
3
500 to 750
3
FM Global, NFPA 13 and 14
Wet
HC-1, HC-2, HC-3 FM Storage
Municipal Supply