The unique aspect of this project was that it is a package of residual buildings for a lumber mill.
New Construction
25,000 to 50,000
2
500 to 750
4
NFPA 13 and 20
Dry
Extra Hazard Group II
River, Lake, Pond, or Reservoir supplemented by a Fire Pump
Description
The unique aspect of this project was that it is a package of residual buildings for a lumber mill.
New Construction
25,000 to 50,000
2
500 to 750
4
NFPA 13 and 20
Dry
Extra Hazard Group II
River, Lake, Pond, or Reservoir supplemented by a Fire Pump